Proposed Capacity Overview

For procurement purposes, the 60MW target refers to AC export capacity or DC installed PV capacity. The preliminary basis used here is 60MW AC and approximately 75MWp DC. This affects the module quantity, inverter configuration, expected generation, grid export limit, equipment pricing and plant layout. The 20MW/80MWh BESS rating likewise needs to specify whether 80MWh refers to installed nominal battery energy or usable energy delivered at the grid connection point. Battery degradation, auxiliary consumption, conversion losses and operating reserves affect deliverable energy.

kaputei solar farm specifications overview
Proposed Project Specifications

Kaputei Solar Farm is a proposed utility-scale renewable energy development by Phikes Chrome Company Limited, situated in the Kaputei Plains of Kajiado County, Kenya. The project is designed to harness the region's solar energy potential through the development of a grid-connected solar photovoltaic (PV) power generation facility integrated with a Battery Energy Storage System (BESS). The proposed development comprises an installed solar photovoltaic capacity of approximately 78.0048 MWp DC, configured to deliver up to 60 MW AC of controlled export capacity to the national electricity grid. The solar installation will be supported by a 20 MW / 80 MWh battery energy storage facility, providing four hours of nominal storage duration at rated discharge power. The project will utilise 130,008 high-efficiency bifacial monocrystalline photovoltaic modules, each rated at 600 W, together with utility-scale power conversion equipment, medium-voltage collection infrastructure, a main step-up transformer and a 132 kV grid interconnection arrangement. Phikes Chrome Company Limited has secured approximately 378 acres of land for the project. Following consideration of the proposed plant configuration and associated facilities, approximately 200 acres have been identified as sufficient for the solar power plant and its associated infrastructure. The remaining land provides additional flexibility for access, drainage, operational requirements, future expansion and other compatible project activities, subject to detailed planning and approvals.

whatsapp image 2026 11 10 at 1.18.05 pm(2)
Developer Proposed Specs for the PV
whatsapp image 2026 11 10 at 1.18.08 pm(1)

Project Overview